Polyester Geogrid installation begins with proper site preparation. The ground must be inspected, and unsuitable materials, loose debris, or unwanted vegetation should be removed according to the project specifications. The surface is then prepared to provide a suitable base for placing the reinforcement. Once the ground is ready, the geogrid rolls are transported to the installation area. Workers unroll the material carefully and position it according to the approved construction drawings. The grid should lie flat, without unnecessary folds, wrinkles, or twists. Overlaps and connections must follow the manufacturer’s instructions and engineering requirements.
The required overlap length depends on the product, soil conditions, and project design. It should not be decided randomly at the construction site. Correct positioning is important because gaps or incorrect overlaps can affect reinforcement continuity. After placement, suitable aggregate or soil is spread over the geogrid. This process should be performed carefully to avoid damaging or moving the material. Construction equipment should follow the approved installation sequence, and direct movement over exposed geogrid should be avoided unless the installation method permits it.
Visit Here: https://www.singhalglobal.com/products/polyester-geogrid-or-pet-geogrid