Geonet installation should follow the project’s engineering design and the manufacturer’s instructions. Before installation, the base surface should generally be prepared so that sharp objects, debris, or irregularities do not damage the material. Rolls should be handled carefully and positioned according to the planned drainage direction. Overlaps, seams, and connections should be completed using suitable methods for the specific system. If a geotextile is used with the geonet, it should be placed and secured in a way that maintains contact while protecting the drainage channels from soil intrusion. During construction, workers should avoid unnecessary dragging, folding, puncturing, or heavy equipment movement directly over exposed geonet. Sounds simple, but small installation mistakes can affect the final system. The drainage outlet also needs proper connection because water must have a clear route away from the protected area. After installation, inspection can help identify visible damage or poor overlaps before the system is covered. Good installation is therefore not just about placing the rolls on the ground; it is about maintaining the intended drainage pathway from collection point to outlet.
Visit Here: https://www.singhalglobal.com/products/geonet-geo-fabric
How Should Geonet Be Installed?
Share